Home > products > Asphalt mixing plant > BA1000 ASPHALT MIXING PLANT(Price:$200,000-$300,000)

BA1000 ASPHALT MIXING PLANT(Price:$200,000-$300,000)

BA1000 asphalt mixing plant is a medium-sized asphalt mixing plant. The mixer discharges 1000kg each time, and the total weight is about 120t. BA1000 asphalt mixing plant adopts the latest components and accessories for production and assembly, which can ensure that the technical level of the whole machine is synchronized with the international advanced level, and ensures the stability and longevity of the equipment. High-efficiency output, this set of equipment is exported to more than 50 countries,

Inquiry

BA1000 Asphalt Mixing Plant Product Description

BA1000 Asphalt Mixing Plant adopts the overall template, the configuration is more centralized and standard, and the degree of prefabrication and preinstallation is higher.
In line with China’s road and rail transportation conditions, the weight distribution is more reasonable. Dismantle, connect,
Shipping, reloading processes have become faster and easier, with less cost and time savings.

Model BA1000 Asphalt Mixing Plant
Type Batch Mix / Hot Mix
Capacity 85 Tons Per Hour (Standard Working Condition)
Mixer 1000kg/batch
Fuel Consumption Diesel consumption: 5.5-7.0 kg /ton
Weighing Precision Hot aggregate ±0.5%; bitumen ±0.3%; filler:±0.2%
Hot Asphalt Temperature 130℃-165℃(adjustable)
Air Emissions ≤20mg/Nm³
Working Noise ≤70db(A)
Operation Full Auto/Manual Operation
Installation Power 240kw
Voltage 220V/380V-50Hz (adjustable)
Plant Covering Area Length: 40m; width: 32m; max height point: 18m
Total Weight 120t
Documents Lay-Out/ Electric Circuit Diagram; Chinese-English Operation Manual; Qualification Certificate

 

BA1000 Asphalt Mixing Plant Characteristic

High thermal efficiency for dust removal and drying;

● Modular design, a variety of layouts to choose from, suitable for installation in narrow, complex and irregular sites, and the floor space is reduced by 33% compared with the traditional structure;

● The self-developed dual frequency conversion burner has higher combustion efficiency and stronger oil adaptability;

● A number of environmental protection technologies such as wind blocking and dust suppression, micro-fog dust reduction, plasma purification and process closure can effectively solve dust, smoke and noise pollution (optional);

● Asphalt “fast heating” technology, realizes “freshness” of asphalt, saves fuel, and shortens production preparation time. It only needs to start the heat-conducting oil furnace 30 minutes in advance, and it can be put into production (optional);

Standard working condition mentioned contains the following factors

  1. Environmental temperature is 20 ℃ with standard atmospheric pressure; altitude ≤2000m;
  2. Average moisture content of coldaggregate<5%;
  3. Hotaggregatetemperature<160 ℃;
  4. Finished materials is medium-grained, the stone volume-weight ≥1600kg/m3;
  5. Sandcontent <35%;
  6. The ratio of aggregate shall meet the national standard. Dust content of cold aggregate ≤3%;
  7. Coldaggregateshould beclean enough without too much dirt or other material.Coldaggregategradationshouldbe continuous;
  8. Coldaggregateshall not containlarge amounts of oversized material,otherwise it will causeblocking,resulting in reducedabilityto supply aggregate;
  9. Moisture content of powder must be less than 0.5%, and there should be no lumping or arching, otherwise it will cause supplying interruption or lag, which can affect the productivity;

BA1000 Asphalt Mixing Plant Application and After-Sales Service

The main products are BA700 / BA1000 / BA1500 /BA2000 / BA3000 / BA4500 / BA5000 asphalt mixing plant, heat transfer oil heating asphalt equipment, stabilized soil plant mixing equipment, emulsified asphalt equipment, modified asphalt equipment, asphalt de barrel equipment, large asphalt warehouse and thermal regeneration equipment. Among them, the technology of BA1000-BA3000 asphalt mixing plant is imported from Italy, which is at the leading level in China.

Warranty: 12 months after erecting the whole plant.